The Principles of Geosteering | Geosteering Best Practices

Assessment

1. Planning for sidetracks or bailout points is a part of:

A .Optimal Plan
B .Uncertainty Plan
C .Both (A) and (B)

2. The geosteering team should always prioritize lateral length against reservoir exposure ______.

A .before the well is spudded
B .before the well lands in section
C .after the well lands in section

Recommended for You

Case Study Geosteering

Geosteering Practices

Preparing the Geosteering Plan

About PETRO SHINE

Check Also

porosity well log interpretation, porosity, well log, petrophysical evaluation, petrophysical interpretation

Porosity | What is porosity in well logging?

Porosity | What is porosity in well logging? After completing this course "Porosity", you will be able to: